


We are engrossed in accelerating the professionals in this computer age. We know each vendor has its own particular style.

We have the special feature of practice API test. Practice exam before the real API exam on our website. We know everyone wants to be an emerged professional. We know you are concerned about your time and money. A foot diameter tank must have at least.We offer what exactly you are looking for. The maximum spacing of settlement points is the tank. When the corrosion rates of a tank are not known and the bottom plate thickness can not otherwise be determined, inspection s should be performed within the next years of tank operation to establish corrosion rates. The measured thickness of the bottom course at the inspection was 0. A new tank built in January,was removed from service and internally inspected in January, The bottom course of the tank showed the most general corrosion no isolated corrosion was found. All essentials and non-essentials on WPS. It is not necessary for the inspector to check which of the following? API-653.pdfĪll test results on the PQR. Whether the joints have butt straps or not. The number of rivet rows and type of joint. What is the main factor in determining the efficiency of a rivet joint in a tank? The allowable stress of the rivets. What is the maximum temperature that dry MT can be used? Within the temperature range limitations set by the manufacturer.
API 653 STANDARD PDF FULL
A full hydrostatic test is always required on. The space between the outer periphery of the roof and the tank shell of an external floating roof tank shall be sealed by a flexible device that provides. Annular or bottom plates within 3 inches of the inside edge of the shell. The critical zone of the tank bottom is within the. Widely scattered pits may be ignored, provided. If a welder tests in a 6G position, he qualifies to weld. Thin film linings are usually used for application to. External, UT measurements of a new tank shell shall be made not later than years after commissioning. Penetrameters IQIs are normally placed on the. A weld shall be acceptable by visual inspection if the inspection shows which of the following? The minimum number of settlement points around a tank periphery is. The maximum acceptable undercutting on horizontal butt welds of a reconstructed. Look up table 4.4 annular plate thickness 0.2 “ 5.08 mmĪny clarifications will be greatly appreciated.How many roof rafters must a plank cross over for inspection of the roof of a tank? Reference Publication. thickness bottom plates: 0.05†1.27 mm paragraph 4.4.5.3 and table 6.1 Tmin calculated for bottom shell course: 13.04 mm Nominal thickness of first shell course 15.4 mm 0.61†What ever the outcome should be, to me it does not make sense that the critical zone is allowed to be thinner than the annular plate. If I apply these rules to below example I get some strange results, where I end up with a higher minimum required thickness for the annular plate as for the critical zone. API 650 paragraph 3.4.1 requires a minimum of 6 mm. My best guess it that is has to come from the design code. It is not clear to me what the original bottom plate thickness is supposed to be? I think it cant be the nominal thickness because this can be chosen by the designer as he pleases. The minimum bottom plate thickness in the critical zone of the tank bottom shall be the lesser of 1/2 the original bottom plate thickness not including the original corrosion allowance or 50 percent of tmin of the lower shell course Most of it seems pretty straight forward but I run into problems when I am determining the thickness in the critical zone. I have some problems determining the minimum required thicknesses of floors in accordance with API 653.
